{"id":510,"date":"2012-12-03T09:29:00","date_gmt":"2012-12-03T09:29:00","guid":{"rendered":"http:\/\/www.goodwinairport.com\/?page_id=510"},"modified":"2013-02-12T11:00:02","modified_gmt":"2013-02-12T11:00:02","slug":"costs","status":"publish","type":"page","link":"https:\/\/www.goodwinairport.com\/?page_id=510","title":{"rendered":"Costs"},"content":{"rendered":"<div>\n<div id=\"sub-pp-left\"><img loading=\"lazy\" class=\"alignnone size-full wp-image-772\" title=\"rs_0_Sl_6\" src=\"http:\/\/www.goodwinairport.com\/wp-media\/rs_0_Sl_6.jpg\" alt=\"\" width=\"75\" height=\"600\" \/><\/div>\n<div id=\"sub-pp-right\" style=\"color: #000000;\">\n<p><img loading=\"lazy\" class=\"alignnone size-large wp-image-804\" title=\"Construction_Caucedo_Container_Terminal\" src=\"http:\/\/www.goodwinairport.com\/wp-media\/Construction_Caucedo_Container_Terminal-1024x666.jpg\" alt=\"\" width=\"640\" height=\"416\" srcset=\"https:\/\/www.goodwinairport.com\/gdn2_media\/Construction_Caucedo_Container_Terminal-1024x666.jpg 1024w, https:\/\/www.goodwinairport.com\/gdn2_media\/Construction_Caucedo_Container_Terminal-300x195.jpg 300w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/>A budget construction cost estimate has been prepared for the Phase 1 development of Goodwin Airport with three runways. Costs are based on 2012 prices. No allowance has been included for land\u00a0acquisition\u00a0costs or for inflation.<\/p>\n<h3 style=\"text-align: center;\">Cost estimate for Goodwin Airport<\/h3>\n<table border=\"0\" cellspacing=\"0\">\n<colgroup width=\"279\"><\/colgroup>\n<colgroup width=\"157\"><\/colgroup>\n<tbody>\n<tr>\n<td align=\"LEFT\" valign=\"BOTTOM\" height=\"24\"><span style=\"color: #000000;\">Item<\/span><\/td>\n<td align=\"RIGHT\" valign=\"BOTTOM\"><span style=\"color: #000000;\">Cost \u00a3 Million<\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"LEFT\" valign=\"BOTTOM\" height=\"18\"><span style=\"color: #333333;\">Construction of The Island<\/span><\/td>\n<td align=\"RIGHT\" valign=\"BOTTOM\"><span style=\"color: #333333;\">\u00a33,500<\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"LEFT\" valign=\"BOTTOM\" height=\"18\"><span style=\"color: #333333;\">Link To Mainland<\/span><\/td>\n<td align=\"RIGHT\" valign=\"BOTTOM\"><span style=\"color: #333333;\">\u00a31,200<\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"LEFT\" valign=\"BOTTOM\" height=\"18\"><span style=\"color: #333333;\">The Harbour<\/span><\/td>\n<td align=\"RIGHT\" valign=\"BOTTOM\"><span style=\"color: #333333;\">\u00a31,200<\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"LEFT\" valign=\"BOTTOM\" height=\"18\"><span style=\"color: #333333;\">Roads, Rail and Runways<\/span><\/td>\n<td align=\"RIGHT\" valign=\"BOTTOM\"><span style=\"color: #333333;\">\u00a311,400<\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"LEFT\" valign=\"BOTTOM\" height=\"18\"><span style=\"color: #333333;\">Improve Existing Infrastructure<\/span><\/td>\n<td align=\"RIGHT\" valign=\"BOTTOM\"><span style=\"color: #333333;\">\u00a33,000<\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"LEFT\" valign=\"BOTTOM\" height=\"18\"><span style=\"color: #333333;\">Buildings and Structures<\/span><\/td>\n<td align=\"RIGHT\" valign=\"BOTTOM\"><span style=\"color: #333333;\">\u00a38,700<\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"LEFT\" valign=\"BOTTOM\" height=\"18\"><span style=\"color: #333333;\">Equipment and Systems<\/span><\/td>\n<td align=\"RIGHT\" valign=\"BOTTOM\"><span style=\"color: #333333;\">\u00a310,200<\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"LEFT\" valign=\"BOTTOM\" height=\"18\"><span style=\"color: #333333;\"><br \/>\n<\/span><\/td>\n<td align=\"LEFT\" valign=\"BOTTOM\"><span style=\"color: #333333;\"><br \/>\n<\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"LEFT\" valign=\"BOTTOM\" height=\"18\"><span style=\"color: #333333;\">Total<\/span><\/td>\n<td align=\"RIGHT\" valign=\"BOTTOM\"><strong><span style=\"color: #333333;\">\u00a339,200<\/span><\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div style=\"color: #000000;\">Locating an airport offshore is, inevitably, not the cheapest option in terms of construction cost but offsetting this the operational, social and environmental benefits of Goodwin Airport are considerable. In due course a detailed cost-benefit analysis will be required to compare shortlisted airport proposals.<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A budget construction cost estimate has been prepared for the Phase 1 development of Goodwin Airport with three runways. Costs are based on 2012 prices. No allowance has been included for land\u00a0acquisition\u00a0costs or for inflation. Cost estimate for Goodwin Airport &hellip; <a href=\"https:\/\/www.goodwinairport.com\/?page_id=510\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":29,"menu_order":4,"comment_status":"closed","ping_status":"closed","template":"onecolumn-page.php","meta":[],"_links":{"self":[{"href":"https:\/\/www.goodwinairport.com\/index.php?rest_route=\/wp\/v2\/pages\/510"}],"collection":[{"href":"https:\/\/www.goodwinairport.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.goodwinairport.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.goodwinairport.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goodwinairport.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=510"}],"version-history":[{"count":35,"href":"https:\/\/www.goodwinairport.com\/index.php?rest_route=\/wp\/v2\/pages\/510\/revisions"}],"predecessor-version":[{"id":518,"href":"https:\/\/www.goodwinairport.com\/index.php?rest_route=\/wp\/v2\/pages\/510\/revisions\/518"}],"up":[{"embeddable":true,"href":"https:\/\/www.goodwinairport.com\/index.php?rest_route=\/wp\/v2\/pages\/29"}],"wp:attachment":[{"href":"https:\/\/www.goodwinairport.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=510"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}